🐶 June sites available🐶 Engineer on site within 3 days🐶 Written quote in 7 days🐶 5-year warranty · Fixed price🐶 Demo site · construction firm example · by Beeglantee🐶 June sites available🐶 Engineer on site within 3 days🐶 Written quote in 7 days🐶 5-year warranty · Fixed price🐶 Demo site · construction firm example · by Beeglantee
Order yours →
ALL PROJECTS
· New construction · 2023

Residential Building GF+5

Novi Beograd2,800 m² 16 months
Residential Building GF+5
Residential Building GF+5 2
Residential Building GF+5 3
Residential Building GF+5 4
· PROJECT STORY

How we did it.

A GF+5 residential building with an underground garage in Block 67. The investor required a fast schedule (18 months max from permit to handover), energy class B, and satisfied buyers across all 24 units.

RC monolithic structure with 25cm walls. 16cm EPS insulation on the facade, 14cm on the roof, 8cm under the ground-floor slab. PVC windows with 6-chamber frames and triple glazing Ug=0.6.

Every apartment includes finished flooring, laminat 8mm AC4, premium bathroom tiles (Marazzi), and kitchens with thermal-break doors. 2x Otis Gen2 lifts (one freight). Completed in 16 months, 2 months ahead of schedule. All 24 units sold before occupancy.

16 months for a GF+5 building with a garage, and not a single hidden cost. Beagle Build stood out among 6 bids for the quality of their documentation and clarity of the payment schedule. We have already started a new project with them.

ProBeograd Invest
Investor